Clever use of process heat in the waste incineration. 28MW wired ready for connection performance and manufactured in modular design of Pai. A large industrial plant for Stadtwerke Hamm, which was produced by Pai, was regarded as a ubermannen high photo including the performance data. 2011, the Elsterheider specialist for heat distribution had built the plant for the extraction of heat from the Hamm waste incineration plant. It was built and configured according to the customer’s requirements and complying with plant modular on-site.Latest control technology for ease of use and adjustment of the equipment can be supplied ready for connection and connected easily with common interfaces of building or network control technology. On the PEWO Energietechnik GmbH 2012 in Erfurt visitors could see booth to energy efficiency what was meant.
A large industrial plant for Stadtwerke Hamm, which was produced by Pai, was regarded as a ubermannen high photo including the performance data. 2011 had the Elsterheider specialist for heat distribution built the plant for the extraction of heat from the Hamm waste incineration plant. Despite the very high transmission power, the plant was prefabricated modular industrial factory, then within a short time after Hamm deliver them and set up to allow. Especially with modernizations and reconstructions an invaluable advantage. Here high planning and cost guarantees arise for customers.
Adapted to the local conditions like connection location, Einbringmasse and room sizes can be implemented as space-filling plants. Are no limits the wishes of the operator. All facilities are built according to the respective standards of the power plant. Again and again, new hydraulic circuits are researched and implemented, such as for example the dynamic return temperature optimization in support of lowering the temperature in district heating networks. Drawings in 3D can be created, to make the projects from the outset tangible. Pai can realize pressure ratings up to PN 40 and welds if necessary in the X-ray procedure check. Latest control technology for ease of use and adjustment of the equipment can be supplied ready for connection and connected easily with common interfaces of building or network control technology. The talks at the booth showed that this flexibility and expertise is highly regarded.